Vallecito Dam Construction Project
Pages
-
-
Looking toward right abutment
-
Looking toward right abutment in bottom of cut-off trench from sta. 8+50. Dragline is removing timbers from Test Pit No. 11., Original photo number: Pine R - 069
-
-
Looking toward right abutment in cut-off trench
-
Looking toward right abutment in cut-off trench. Part of footing for concrete wall is seen on slope. Wagon drill is working on 50-foot grout hole. Refer to Pine R - 66., Original photo number: Pine R - 139
-
-
Looking toward right side of spillway (1)
-
Looking toward right side of spillway along cut-off trench at station 6+32. Trench was excavated in bedrock by line-drilling and light blasting., Original photo number: Pine R - 418
-
-
Looking toward right side of spillway (2)
-
Looking toward right side of spillway along cut-off trench at station 5+84. Trench was excavated by line-drilling, light blasting and barring. Grout pipe are being set in foreground., Original photo number: Pine R - 332
-
-
Looking upstream along outlet channel centerline (2)
-
Looking upstream along centerline of outlet channel. Picture taken at 11:45 AM, a few minutes before water flowed over weir wall. Standing on temporary bulkhead from left to right - C. A. Burns, H. F. Bahmeier, and F. F. Smith., Original photo number: Pine R - 046
-
-
Looking upstream along right spillway wall (1)
-
Looking upstream along right wall of spillway from sta. 11+44. Note excavation for wall footing. Steep slope is result of widening required for increased width of footing. Drains at edge of footing have not been placed., Original photo number: Pine R - 442