Vallecito Dam Construction Project

Pages

Upstream view of temporary cofferdam (1)
Looking upstream at temporary cofferdam while closure was being made., Original photo number: Pine R - 384
Upstream view of temporary cofferdam (2)
Looking upstream at temporary cofferdam. Box culvert is carrying the flow of the river., Original photo number: Pine R - 389
Vehicle at Work
Depicts a vehicle performing unknown duties on dam construction site., Original photo number: Pine R - 165
View from opposite station of left abutment
View from opposite station 16+00 looking toward left abutment. The partially excavated secondary cut-off trench is seen in the distance. The primary cut-off trench is in the middle background., Original photo number: Pine R - 123
View of bulldozer trimming slope
Bulldozer trimming upstream slope of embankment preparatory to placing rock riprap., Original photo number: Pine R - 129
View of cofferdam
View of cofferdam looking upstream from a point 115 feet downstream from axis at station 13+00., Original photo number: Pine R - 062
View of cut-off trench
View of cut-off trench looking toward left abutment from opposite station 15+50, showing sand deposits being removed. Refer to Pine R - 121., Original photo number: Pine R - 255
View of cut-off trench excavation and left abutment
Cut-off trench excavation looking toward left abutment from a point opposite sta. 24+00. The excavation is complete from the transit in foreground to the group standing in bottom of trench., Original photo number: Pine R - 149
View of cut-off trench excavation and right abutment
Excavation for cut-off trench from point near station 21+00 looking toward right abutment., Original photo number: Pine R - 128
View of cut-off trench looking toward right abutment
View of cut-off trench looking toward the right abutment of the dam from the upstream rim of the cut-off trench opposite station 33+50. Refer to Pine R - 71, Original photo number: Pine R - 277
View of dam looking downstream (1)
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream., Original photo number: Pine R - 070
View of dam looking downstream (2)
View of dam looking downstream from a point on left side of reservoir, approximately 1/4 mile upstream., Original photo number: Pine R - 072

Pages