Looking upstream at right side of spillway excavation. White line is at station 5+29.89 and represents the 1 to 1 slope to which rock will be excavated between stations 5+00 and 5+29.89, prior to replacement of concrete slab. Note shattered condition of rock caused by blasting., Original photo number: Pine R - 400