Lima dragline excavating No. 1 material in Borrow Pit No. 2, area No. 2, station 53+50/11+90. The cut is 11 ft. Approximately an 8 ft. cut has previously been excavated by the dragline and materials placed in the upstream part of the No. 2 zone., Original photo number: Pine R - 182